Original Post Featured Posts Reclaiming new land for the Philippines’ largest airport – PHOTO UPDATE 9/19/2022 Chinese companies sanctioned by US for South China Sea island-building 8/28/2020 Tan, Yuchengco, Virata submit new Sangley Airport proposal 11/8/2021 BOI, PEZA investments plunge 90% in 2 months 4/2/2022 The Bataan-Cavite Interlink Bridge 3/5/2022 Sangley International Airport 4/6/2022 Engineering Design Contract Awarded for ADB-Supported Bataan–Cavite Bridge Project in the Philippines 10/22/2020 Multinational consortium bags $11 billion Sangley Point International Airport Project 9/15/2022 Tan, Yuchengco, Virata submit new Sangley Airport proposal 11/8/2021 DPWH to submit list of flood control projects to Marcos 7/28/2025 PBBM rings the closing bell at the NYSE after attending an economic forum 9/20/2022 Philippines’ corruption probe expands to more infrastructure 9/23/2025 BATAAN-CAVITE INTERLINK BRIDGE 3/3/2022 Reclaiming new land for the Philippines’ largest airport – PHOTO UPDATE 9/19/2022 Reshaping Cebu: Reclamation projects 2/13/2022