Original Post Featured Posts Detailed engineering design of Bataan-Cavite Interlink Bridge now 34% complete! 3/22/2022 The Bataan-Cavite Interlink Bridge 3/5/2022 Las Piñas-Parañaque reclamation project OK'd 10/27/2021 Engineering Design Contract Awarded for ADB-Supported Bataan–Cavite Bridge Project in the Philippines 10/22/2020 The Cebu Cordova Link Expressway is set to open to the public on April 28, 2022. Lezz Go Cebu! 4/2/2022 Cebu-Cordova Link Expressway (CCLEX) 4/28/2022 Las Piñas-Parañaque reclamation project OK'd 10/27/2021 MGDC gets notice to proceed with bay reclamation 2/26/2021 MGDC gets notice to proceed with bay reclamation 2/26/2021 Samsung-backed group wins $11bn Philippine airport deal 9/15/2022 Tan, Yuchengco, Virata submit new Sangley Airport proposal 11/8/2021 JAZA, EKR, RSA, Sabin Aboitiz, Hans Sy join Marcos in NY for biz pitch 9/20/2022 The Cebu Cordova Link Expressway is set to open to the public on April 28, 2022. Lezz Go Cebu! 4/2/2022 Yuchengco-Virata consortium bags Sangley airport project 9/15/2022 PBBM makes investment pitch 9/21/2022